Impressively, we are still married, still speaking with each other, and we still have all of our digits in tact.
So, how much did we finish on our wish list from June?
To-Do "Immediately"
all items scratched out either A) will never be completed or B) haven't been completed, YET
1) Bedroom: paint ceiling, walls, trim, closet, doors;
2) Other bedroom: paint ceiling, walls, trim, closet; install new lighting;
3) Bathroom:
4) Dining room: paint ceiling, walls, trim, china cabinets inside & out; install new lighting;
5) Living room: paint ceiling, walls, trim;
6) Entry way: paint closet,
7) Hallway: paint closets,
8) Kitchen: rip off wallpaper; install appliances; install counter top & sink; strip cabinets; paint cabinets inside & out; attach hardware; add shelving in cabinets; paint trim, walls; install new lighting.*
9) Upstairs Half-Story:
10) Basement: install dryer; remove leaky cement sink; install new utility sink;
11) Outside: install mailbox; trim back large shrubs; mow the lawn
*There is NO WAY that we would have been able to get the kitchen in any kind of order by ourselves. Lucky for us, our friend and former Uptown neighbor Dan Hanson is the owner of Hanson Building and Remodeling - he saved our butts.
Overall, we are pleased with our progress, especially after looking back at the photos on this blog. Can you believe that kitchen?!